Graphical Job Schedule
Objective
To provide a visual representation of the production
schedule and allow drag-and-drop manipulation to enhance factory production.
The Value of SYSPRO Graphical Job Schedule
- Presents a graphical view of the
utilization of each work center by job and day
- Effectively monitor each job and identify potential
problem areas before they become obstacles
- View Available to Promise (ATP) graphically
- Highlights overloads as well as underloads
- Demand pegging and supply chain operation available
at a glance with the ability to update shipping or due
dates
- View and control multiple constraints in the production
schedule
- The effect of queue time, elapsed time, move time and
routing on dates and capacity loadings is apparent, user can review
routing procedures
- Work Center Capacity Calendar is visible in its entirety
and can be easily manipulated
- Permits complete reload of each job on a forward or
backward basis
- Preview of reports to screen and e-mail capabilities
- At a glance job status regarding material
allocations and operations
- Supports backflush environments that
operate a JIT/Kan Ban production system
Matching SYSPRO to Your Business
- Real-time, on-line scheduling information
that reflects the shop floor demand
- Easily manipulate the schedule using a simple to use
drag-and-drop process
- Graphically presents a schedule for review
- Gives a more concise tactical view of production schedules
and workloads by day and by job graphically
- View production schedule by work center, or by the
job
- Job conflicts become readily apparent
- Choose how many productive units should be scheduled
during the job and how much overtime is permitted
- Drag and drop scheduling with WIP updated inreal-time
- Manipulate operation capacity loading using smoothing,
forward or backward loading functions
- Analyze the Work Center Capacity Calendar including
working days, capacity hours, available productive units and overtime
potential
- Modify the operation planned finish date, move time
and queue buffer
- Adjust both consecutive and concurrent operation/routings
- Determine if the job planned start date can be started
earlier, delayed or compressed to meet the due date
- Analyze the potential for using an alternate
work center or subcontractor to complete the task
Integration
- Graphical Job Schedule for SYSPRO integrates and is
required with the Work in Progress module
|
|