MANAGE 2000s powerful Multiple Revision Level Processing provides an engineering sandbox for definition of engineering bills of materials (bills), while manufacturing bills are under strict Engineering Change Order (ECO) control. Using it the following are controlled by revision level effective date, non-effective date, ECO number, ECO release date, quantity per assembly (QPA), reference designators, component detail usage and balloon number